KePin (DongGuan) Testing Instruments Co., Ltd.
0086-769-88034181E-mail:server@kepin17.com  Homepage-Favorite   Language:中文 English
  • Home
  • About
  • Instrument
  • Download
  • Case
  • Job
  • Contact Us
  • Affiliate
  • Search
Tracking index tester--Needle flame tester--Glow Wire Tester--UL94 Vertical Horizontal burning tester--Dielectric breakdown voltage Testers

Information

Company News
Industry News
Video Center

Contact Us

 KEPIN fire testing technology ltd
 Global service hotline:
 0086-769-88034181
 Email:server@kepin17.com
 CN website:
 http://www.kepin17.com
 EN website:
 http://www.kepin17.com/en/
 Address:Changan Xin'an community hengzheng Road shongbo Business Centre No.102 Dongguan city

Current Location:Home > Information > Company News
Company News

Wujiaqu agricultural bureau of quality and technical supervision of jurisdiction 4 home building materials lab for supervision and inspection

Wujiaqu agricultural bureau of quality and technical supervision of jurisdiction 4 home building materials lab for supervision and inspection

Secco products instrument website inquiry: to ensure construction quality, regulate the behavior of building materials laboratory testing, to ensure that "quality month" activities to implement, actively develop the route of "mass education" practical results. Wujiaqu agricultural bureau of quality and technical supervision recently districts four building materials laboratory for the special supervision and inspection.

 

Law enforcement by looking at the equipment parameter, parameter measurement, certification attachments and detection range, detection product parameter, equipment running records, the original records, inspection report and on-site storage conditions, equipment running status, the inspection agency inspection capabilities, quality assurance ability, level, the holder and has carried on the detailed inspection report quality, and through the standard implementation of numerical testing of repair, and the retained samples were asked about, comprehensive mastery of the examination organization levels and business situation.

 

Law enforcement officers found in the inspection and ask, numerical revised part is common building materials laboratory report, incoming sample inspection except cement block 28 days test sample not ready, such problems as incomplete equipment operation record, law enforcement officers gradually in the future inspection specification requirements lab, at the same time a problem building materials laboratory according to the relevant administrative regulations for the administrative penalty, to regulate the behavior of the building materials inspection agency.

Clicks:  Updated:2013-10-04 15:03:51  【Print this page】  【Close】
Previous:Decoration new material flame retardant performance requirements are too low, it is recommended that the revision of relevant standards   Next:B2 insulation materials should be set fire belt on each floor
Quick NavigationAbout KEPINTechnical Support
InstrumentCompany ProfileService
Standard DownloadContact UsPartner
Manual DownloadInformationAffiliate
MessageVideo CenterSiteMap
Search
0086-769-88034181

KePin (DongGuan) Testing Instruments Co., Ltd. All rights reserved

Address: the second industrial zone ssangyong's night side, dongguan city road too coupon lane no. 1 industrial park
Technical support: 13729993710 Mr Wang email:server@kepin17.com

KePin Detection technologyTo provide you with professionalTest equipment、Flame retardant test equipment、The cable tester、High polymer material tester
科品仪器-建筑材料燃烧试验机-燃烧性能分析测试仪-材料阻燃等级试验