KePin (DongGuan) Testing Instruments Co., Ltd.
0086-769-88034181E-mail:server@kepin17.com  Homepage-Favorite   Language:中文 English
  • Home
  • About
  • Instrument
  • Download
  • Case
  • Job
  • Contact Us
  • Affiliate
  • Search
Tracking index tester--Needle flame tester--Glow Wire Tester--UL94 Vertical Horizontal burning tester--Dielectric breakdown voltage Testers

Information

Company News
Industry News
Video Center

Contact Us

 KEPIN fire testing technology ltd
 Global service hotline:
 0086-769-88034181
 Email:server@kepin17.com
 CN website:
 http://www.kepin17.com
 EN website:
 http://www.kepin17.com/en/
 Address:Changan Xin'an community hengzheng Road shongbo Business Centre No.102 Dongguan city

Current Location:Home > Information > Company News
Company News

B2 insulation materials should be set fire belt on each floor

B2 insulation materials should be set fire belt on each floor

Secco products instrument website reported: on September 25th, reporter learned from the provincial department of live built that province before living building department issued a "about to civil building exterior insulation materials of fire supervision and management of the relevant matters notice, to ensure fire safety of construction projects, effectively prevent and reduce fire accident building external wall thermal insulation material.

 

Notice requires that the curtain wall type building height is greater than or equal to 50 meters in our province, the combustion performance of insulation materials shall be the A level; Building height is greater than or equal to 24 m, less than 50 m, the combustion performance of insulation materials should not be lower than B1 level. When B1 level material is used, should be set fire belt in each layer. At the same time, should use noncombustible material protective layer, building the first protective layer thickness should not less than 10 mm, other floor should not be less than 5 mm. Building height less than 24 meters, the combustion performance of insulation materials should not be lower than B1 level. When B1 level material is used, should be every two layer set fire belt; When using B2 materials should be set fire belt on each floor.

Clicks:  Updated:2013-10-04 14:13:16  【Print this page】  【Close】
Previous:Wujiaqu agricultural bureau of quality and technical supervision of jurisdiction 4 home building materials lab for supervision and inspection   Next:Renovation of decoration materials inspection depends on the construction area and engineering investment
Quick NavigationAbout KEPINTechnical Support
InstrumentCompany ProfileService
Standard DownloadContact UsPartner
Manual DownloadInformationAffiliate
MessageVideo CenterSiteMap
Search
0086-769-88034181

KePin (DongGuan) Testing Instruments Co., Ltd. All rights reserved

Address: the second industrial zone ssangyong's night side, dongguan city road too coupon lane no. 1 industrial park
Technical support: 13729993710 Mr Wang email:server@kepin17.com

KePin Detection technologyTo provide you with professionalTest equipment、Flame retardant test equipment、The cable tester、High polymer material tester
科品仪器-建筑材料燃烧试验机-燃烧性能分析测试仪-材料阻燃等级试验