KePin (DongGuan) Testing Instruments Co., Ltd.
0086-769-88034181E-mail:server@kepin17.com  Homepage-Favorite   Language:中文 English
  • Home
  • About
  • Instrument
  • Download
  • Case
  • Job
  • Contact Us
  • Affiliate
  • Search
Tracking index tester--Needle flame tester--Glow Wire Tester--UL94 Vertical Horizontal burning tester--Dielectric breakdown voltage Testers

Information

Company News
Industry News
Video Center

Contact Us

 KEPIN fire testing technology ltd
 Global service hotline:
 0086-769-88034181
 Email:server@kepin17.com
 CN website:
 http://www.kepin17.com
 EN website:
 http://www.kepin17.com/en/
 Address:Changan Xin'an community hengzheng Road shongbo Business Centre No.102 Dongguan city

Current Location:Home > Information > Industry News
Industry News

Ultra-high voltage cable in line three security requirements:

Ultra-high voltage cable in line three security requirements:

 

(1) to establish accurate, reliable and secure communication system. Need to operate the power switch to the nearest, suspended cable traction at any time, ensure the cable equipment against losses. 1) in the cable, hoist and its key parts position bell switch, electric bell, radios and other devices, and hold people operating and monitoring. 2) make unified command signal and action rules, the control to rapid and reliable, because of the simplicity of the signal to before the cable laying should be control signal system installation and debugging and use method of signal device to all the staff of laying cable.

 

(2) take the necessary safety technical measures. 1) USES the brake line of the rotation of the disk. 2) use the twister eliminate the torsional stress. 3) install the tension meter monitor traction size. When laying on the hoist and installed on both ends of the cable tension machine, when traction over the allowable values of cable laying, can rapidly through controlled contact equipment to cut off power supply.

 

(3) other matters should be paid attention to safety. 1) before laying fixed plug should be used when the temporary power box, power box shell must be reliable grounding. 2) cable drag, it is forbidden to move the cable with the hand, in case of crushed. Cable traction, all personnel are strictly prohibited in the traction angles stay, construction personnel should be on the safe position, spirit is concentrated, to obey the unified command. 3) in laying parts of the shaft and tunnel is relatively complex, the construction of such as have the sudden power failure, should immediately brake line plate and tighten all the anchor rope tight.

Clicks:  Updated:2013-09-22 09:45:57  【Print this page】  【Close】
Previous:Building materials and energy saving, flame retardant insulation test records fill out the request  Next:Workers live in dangerous house, bare wire leakage fire three times in a night
Quick NavigationAbout KEPINTechnical Support
InstrumentCompany ProfileService
Standard DownloadContact UsPartner
Manual DownloadInformationAffiliate
MessageVideo CenterSiteMap
Search
0086-769-88034181

KePin (DongGuan) Testing Instruments Co., Ltd. All rights reserved

Address: the second industrial zone ssangyong's night side, dongguan city road too coupon lane no. 1 industrial park
Technical support: 13729993710 Mr Wang email:server@kepin17.com

KePin Detection technologyTo provide you with professionalTest equipment、Flame retardant test equipment、The cable tester、High polymer material tester
科品仪器-建筑材料燃烧试验机-燃烧性能分析测试仪-材料阻燃等级试验