KePin (DongGuan) Testing Instruments Co., Ltd.
0086-769-88034181E-mail:server@kepin17.com  Homepage-Favorite   Language:中文 English
  • Home
  • About
  • Instrument
  • Download
  • Case
  • Job
  • Contact Us
  • Affiliate
  • Search
Tracking index tester--Needle flame tester--Glow Wire Tester--UL94 Vertical Horizontal burning tester--Dielectric breakdown voltage Testers

Information

Company News
Industry News
Video Center

Contact Us

 KEPIN fire testing technology ltd
 Global service hotline:
 0086-769-88034181
 Email:server@kepin17.com
 CN website:
 http://www.kepin17.com
 EN website:
 http://www.kepin17.com/en/
 Address:Changan Xin'an community hengzheng Road shongbo Business Centre No.102 Dongguan city

Current Location:Home > Information > Industry News
Industry News

Construction materials, equipment required testing approach

Construction materials, equipment required testing approach

 

1) the principle of individual supplies department responsible for the scene play material quality, can use after the reinspection, to field laboratory supplies department to handle trust test. Duty engineer shall be in accordance with the provisions in the process of process to do entrust sampling field laboratory, including concrete, mortar, reinforcement, fittings, backfill soil, etc. The site quality inspection of the sectional division shall be the responsibility of the quality department of homeland security

 

2) raw materials to use must first test, in order to prevent the nonconforming used in engineering, quality accident. Entrusted by the engineering department to handle the raw material test, field laboratory to guide how to sampling, the principle of group group, after accepting authorization, the lab should be sent to the laboratory test and retrieve the test report.

 

3) procedure must be on the project after test qualified to enter the next process, mainly include: steel connections: before the formal use, must do procedure qualification test pieces in formal use, should take the batch sampling test, qualified only after pouring concrete. Backfill soil test: before the formal backfill, should first will be ready to backfill materials, central laboratory do standard compaction test, control of dry density index are obtained. Formal backfill, stratified sampling, testing dry density and moisture content. After qualified, are allowed to backfill on the first floor.

 

4) representative samples of various materials in accordance with the provisions, the sampling method of sampling, to ensure that the representation of the test, especially for concrete samples, the raise block on the truck to the site before entering the pump after sampling, with conditions in the die block before sampling.

 

The above content are according to the students the problems in the practical work of finishing, for your reference, if there is any question, please timely communication, to point out mistakes.

Clicks:  Updated:2013-09-06 10:25:16  【Print this page】  【Close】
Previous:Kant's new photoelectric material has been accepted by the company zhangjiagang entry-exit inspection and quarantine bureau   Next:Ac/dc high voltage tracking machine sheet metal chassis physical picture
Quick NavigationAbout KEPINTechnical Support
InstrumentCompany ProfileService
Standard DownloadContact UsPartner
Manual DownloadInformationAffiliate
MessageVideo CenterSiteMap
Search
0086-769-88034181

KePin (DongGuan) Testing Instruments Co., Ltd. All rights reserved

Address: the second industrial zone ssangyong's night side, dongguan city road too coupon lane no. 1 industrial park
Technical support: 13729993710 Mr Wang email:server@kepin17.com

KePin Detection technologyTo provide you with professionalTest equipment、Flame retardant test equipment、The cable tester、High polymer material tester
科品仪器-建筑材料燃烧试验机-燃烧性能分析测试仪-材料阻燃等级试验